About the Ernestown Wind Park Project
Ernestown Wind Park is a 10MW wind project located in Loyalist Township, Ontario built by the Horizon Legacy Group. The project began supplying electricity to the grid in 2014. Five Enercon E82 turbines produces enough to power 2000 homes annually. Three turbines are located on farm land, two are located on a quarry, a great example of multi-purpose land use. Over 50 companies and organizations were involved in building the project. 97% of construction labour, totaling 55,000 hours, was performed by Ontario workers. The project won two awards, including the SWITCH Rural Initiatives Award and the Ontario Sustainable Energy Association’s Sustainable Energy Project of the Year. Many have climbed the 100m turbine to raise money for charity, including firefighters, teachers, environmentalists, and a documentary film maker. It was one of the first wind projects in Ontario with an Indigenous partner.
Project Location
Ernestown Wind Park is located in Loyalist Township, Ontario.
Documents
- Appendix 1 – Emergency Response Plan
- Appendix 2 – Water Assessment Plan
Natural Heritage Evaluation of Significance Report
- Appendix A – Curriculum Vitae
- Appendix B – Field Notes
- Appendix C – Wetland Characteristics
- Appendix D – Amphibian Breeding Habitat Evaluation Data
- Appendix E – Avian Survey Data
- Amphibian breeding habitat pre-construction survey report
- Bat maternity roosting area habitat-use surveys report
- Butterfly stopover area habitat-use survey report
- Landbird migratory stopover habitat use survey report
- Marsh bird breeding area habitat use survey report
- Raptor wintering area habitat use survey report
- Winterfowl nesting area habitat use survey report
Project Design Change Summary Report
- Appendix A – Noise Impact Assessment Report
- Appendix B – Property Line Setback Report
- Appendix C – Turbine Specification Report
- Appendix D – MNR and MTCS Ernestown Wind Park Notification
- Appendix A – Public Consultation
- Appendix B – Aboriginal Consultation
- Appendix C – Municipal Consultation
- Appendix D – Agency Consultation
Summary of Immission and Emission Audits – Nov 2017
- Spring Immission Audit Report
- Fall Immission Audit Report
- Emission Acoustics Audit Report
Contact the Ernestown Wind Team